55 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Great Bear River Environmental and Traditional Knowledge Baseline Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: The objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at this tim...


Travaillant Lake Post Fire Pilot Project
Principal Investigator: Maier, Kris
Licensed Year(s): 2010
Summary: This is a community-driven collaborative project. The Gwichya RRC is the project manager. The community asked for this research to be completed and the GRRB and ENR are providing logistical and technical support. All hiring will be done in the community to maximize community involvement and benefits. The goals of this study are to: 1) Collect baseline vegetation data in habitats around Travai...


2010 Baseline Environmental Studies, Nechalacho Rare Earth Element Project Site
Principal Investigator: Moore, Steve M
Licensed Year(s): 2010
Summary: The 2010 baseline environmental studies will include the following: 1) A rare plant survey to be conducted in mid July (approximate) to identify presence of rare plants within the local study area. 2) An ecosystem mapping field component to be carried out in June and mid July (approximate) to describe existing habitat types within the local study area. Rare plant surveys will be conducted in ...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project-Fisheries Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2010 2009 2008
Summary: The fisheries portion of this baseline program has three primary objectives: to identify the fish species composition in a subset of the lakes and streams near the Thor Lake project area, to identify existing fish habitat in those lakes and streams, and to measure the current levels of mercury, rare earth elements and other trace elements in fish tissues. A secondary objective of the program is to...


Blanchet Mine/ O'Connor Island Phase III Environmental Site Assessments
Principal Investigator: Diplock, David A
Licensed Year(s): 2009
Summary: The objective of this study is to conduct a detailed site investigation of the Blanchet Island Mine to further determine current environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the delineation of contamination from any hazardous or non-hazardous materials left on site. ...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Vegetation Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The objectives of this study are to: - Develop vegetation classification maps for local and regional study areas around the Thor Lake project. This new mapping can be used to identify or assist in the location of sensitive or ecologically important ecosystems, culturally important plants, rare plants and rare ecosystems, and will be the basis for wildlife habitat availability mapping. - Conduct...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Soils, Terrain and Permafrost Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009 2008
Summary: Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project – Groundwater Hydrology and Hydrogeology
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...


Biological Studies of Waters Along the Proposed Mackenzie Gas Project Pipeline Route - Gwich'in Settlement Area
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2009 2008 2007 2006
Summary: This licence is being issued for the scientific research application no. 983. The objective of this study to examine lakes possibly affected by the proposed Mackenzie Gas Project pipeline, and lakes that can serve as future control/reference sites. The researchers will measure the following: nutrients and metals in lake water and sediments, lake water quality (DO, pH, conductivity, etc.), and ...


Nailii Hydroelectric Project
Principal Investigator: Cote, Jason E
Licensed Year(s): 2008
Summary: This licence is issued for the scientific research application # 829. The objective of this research is to research baseline information regarding fish habitat around the hydroelectric development in Whati. . The planned fish and fish habitat assessment will identify available spawning and rearing habitats of northern pike and round whitefish, the previously identified indicator species, withi...


TOTAL PAGES: 6