8 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

The Courageous Lake Project
Principal Investigator: Wen, Marc
Licensed Year(s): 2013
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...


Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


Pine Point Project (N-204)
Principal Investigator: Landry, Francois
Licensed Year(s): 2012 2011
Summary: The objective of the proposed study is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area which is located in proximity to the former Pine Point Mine. Specifically, data will be collected to characterize the following environmental components: air quality, noise, hydrology, hydrogeology, geochemistry, aquatic resources, fish an...


Environmental Baseline Surveys of the Fortune Minerals Ltd. NICO Project
Principal Investigator: Coulton, Daniel
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this research project is to collect environmental baseline information around the proposed mine site. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water quality monitors, GPS units, motorized inflatable boats, fixed wing aircraft and helicopters. An automated meteorological station will collect weather data. Al...


Great Bear River Environmental and Traditional Knowledge Baseline Program
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2011 2010
Summary: The objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at this tim...


Travaillant Lake Post Fire Pilot Project
Principal Investigator: Maier, Kris
Licensed Year(s): 2010
Summary: This is a community-driven collaborative project. The Gwichya RRC is the project manager. The community asked for this research to be completed and the GRRB and ENR are providing logistical and technical support. All hiring will be done in the community to maximize community involvement and benefits. The goals of this study are to: 1) Collect baseline vegetation data in habitats around Travai...


Blanchet Mine/ O'Connor Island Phase III Environmental Site Assessments
Principal Investigator: Diplock, David A
Licensed Year(s): 2009
Summary: The objective of this study is to conduct a detailed site investigation of the Blanchet Island Mine to further determine current environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the delineation of contamination from any hazardous or non-hazardous materials left on site. ...


Izok Project Environmental Baseline Studies
Principal Investigator: Hubert, Ben
Licensed Year(s): 2002
Summary: The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...


TOTAL PAGES: 1