3 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project continues the on-going monitoring program of permafrost and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT). This phase of the project is largely data collection. Objectives are: • To provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and improve characterization...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Soils, Terrain and Permafrost Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009 2008
Summary: Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...


2006 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


TOTAL PAGES: 1