17 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Tlicho All Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4710. The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4671. The main objectives of the field work for 2020 will be: 1) to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and 2) to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collect...


EL462 & EL463 2013-2015 Surface and Groundwater Monitoring Program
Principal Investigator: Hansen, Ken
Licensed Year(s): 2015 2014 2013 2012
Summary: The study is to continue establishing the groundwater and surface water conditions within the exploration licences prior to and during oil and gas exploration activities. Surface Water Quality Sample Collection Collect surface water samples once, during September 2015, from a reduced number of sampling locations targeted near areas where exploration activities have occurred. The water sampl...


De Beers - Gahcho Kué 2014 Environmental Monitoring Program
Principal Investigator: Chisholm, Veronica
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective of the proposed studies is to continue to describe the existing environment, and obtain information once Project activities commence to determine potential project effects. The proposed studies will include the collection of air quality, geochemistry, hydrology, water and sediment quality, and fish and aquatic resources, dustfall, vegetation and soil information. The studies are ...


City of Yellowknife Gold Project
Principal Investigator: Campbell, Joseph W
Licensed Year(s): 2018 2017 2016 2015 2014
Summary: Follow-up on exploration activity associated with MVLWB land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activities are successful. Work will ...


The Courageous Lake Project
Principal Investigator: Wen, Marc
Licensed Year(s): 2013
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Aquatics and Fisheries
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objective of the 2011 Aquatics program is to continue baseline data collection to further characterize the baseline water and sediment quality and aquatic communities at specific lakes within the Thor Lake area and Avalon's Thor Lake Rare Earth Elements Project footprint. The 2011 Fisheries program will focus on the lakes directly affected by and immediately downstream of the proposed Tailings...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


EKATI Aquatic Monitoring Program, 2009-2013
Principal Investigator: Wen, Marc
Licensed Year(s): 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003
Summary: The main objectives of the field work to 2013, will be to determine if the EKATI mine is having an effect on the surrounding aquatic environment and air quality, and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected under ice using a 5L Niskin (a cylindrical PVC water sampler). During the week of spring freshet, hydrolo...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project – Groundwater Hydrology and Hydrogeology
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...


TOTAL PAGES: 2