Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project continues the on-going monitoring program of permafrost and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT). This phase of the project is largely data collection. Objectives are: • To provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and improve characterization...


The Courageous Lake Project
Principal Investigator: Wen, Marc
Licensed Year(s): 2013
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...


Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Vegetation Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The objectives of this study are to: - Develop vegetation classification maps for local and regional study areas around the Thor Lake project. This new mapping can be used to identify or assist in the location of sensitive or ecologically important ecosystems, culturally important plants, rare plants and rare ecosystems, and will be the basis for wildlife habitat availability mapping. - Conduct...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Soils, Terrain and Permafrost Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009 2008
Summary: Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...


Gahcho Kue Project - Hydrology Baseline Work
Principal Investigator: Schmidt, Nathan
Licensed Year(s): 2007 2004
Summary: The overall objective of this project is to collect additional information from Kennady Lake and the surrounding watershed for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project. De Beers Canada Inc. has been conducting hydrology baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to t...


Gahcho Kué Project – Soils and Terrain Baseline Studies
Principal Investigator: Robertson, Scott
Licensed Year(s): 2007
Summary: The overall objective of this project is to collect additional Soil and Terrain information for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project. De Beers Canada Inc. has been conducting Soils and Terrain baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to the Terrain and Soils ba...