23 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Yellowknife Lithium Project Environmental Consulting Services
Principal Investigator: Brezenski, Jeff
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5636. The purpose of the baseline program field studies is to: characterize existing conditions in the project vicinity and surrounding region to support project planning, permitting, and development of a proposed lithium mine. One continuous air quality monitoring station will be installed to measure ambient concentratio...


Environmental Baseline Surveys for the Fortune Minerals Limited NICO Project
Principal Investigator: Schryer, Richard P
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this project is to complete a Supplemental Baseline Monitoring Plan (SBMP) for water quality, fish population and benthic invertebrate programs. The SBMP contains two major study areas: Burke Lake, Reference Lake and the Marian River. Burke Lake will be the exposure area and Reference Lake will serve as the reference area for the SBMP. The exposure area for the Marian River wat...


De Beers - Gahcho Kué 2014 Environmental Monitoring Program
Principal Investigator: Chisholm, Veronica
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective of the proposed studies is to continue to describe the existing environment, and obtain information once Project activities commence to determine potential project effects. The proposed studies will include the collection of air quality, geochemistry, hydrology, water and sediment quality, and fish and aquatic resources, dustfall, vegetation and soil information. The studies are ...


Prairie Creek Mine - Baseline Aquatic Monitoring Program
Principal Investigator: Wilcockson, John B
Licensed Year(s): 2014 2013
Summary: To collect baseline aquatic data in advance of the development of the Prairie Creek Mine. The study will be part of the Aquatic Effects Monitoring Program (AEMP) and will satisfy the requirements of the federal Environmental Effects Monitoring (EEM). The description below is a summary of the planned methodology. Most work will be carried out on Prairie Creek; however, sampling will also be con...


EKATI Aquatic Monitoring Program, 2009-2013
Principal Investigator: Robb, Tonia L
Licensed Year(s): 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003
Summary: The main objectives of the field work for 2009 to 2013 will be to determine if the EKATI mine is having an effect on the surrounding aquatic environment and air quality to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected under ice using a 5L Niskin (a cylindrical PVC water sampler). During the week of spring freshet, hy...


2012 Baseline Aquatic Program for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project
Principal Investigator: Sibbald, Carey
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objective of the 2012 Aquatics program is to continue baseline data collection to further characterize the baseline water and sediment quality and aquatic communities at specific lakes within the Thor Lake area and Avalon's Thor Lake Rare Earth Elements Project footprint. Water, sediment and aquatic organisms will be collected at up to 11 stations (10 lakes) within the Thor Lake area. Most ...


2011 Baseline Studies for Avalon Rare Metals Inc. Proposed Thor Lake Rare Earth Element Project - Surface Water Hydrology and Climate
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...


Pine Point Project (N-204)
Principal Investigator: Landry, Francois
Licensed Year(s): 2012 2011
Summary: The objective of the proposed study is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area which is located in proximity to the former Pine Point Mine. Specifically, data will be collected to characterize the following environmental components: air quality, noise, hydrology, hydrogeology, geochemistry, aquatic resources, fish an...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project-Fisheries Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2010 2009 2008
Summary: The fisheries portion of this baseline program has three primary objectives: to identify the fish species composition in a subset of the lakes and streams near the Thor Lake project area, to identify existing fish habitat in those lakes and streams, and to measure the current levels of mercury, rare earth elements and other trace elements in fish tissues. A secondary objective of the program is to...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Vegetation Component
Principal Investigator: Lennie-Misgeld, Peter
Licensed Year(s): 2009
Summary: The objectives of this study are to: - Develop vegetation classification maps for local and regional study areas around the Thor Lake project. This new mapping can be used to identify or assist in the location of sensitive or ecologically important ecosystems, culturally important plants, rare plants and rare ecosystems, and will be the basis for wildlife habitat availability mapping. - Conduct...


TOTAL PAGES: 3