9 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

WO Diamond Project
Principal Investigator: Hamm, Sharleen
Licensed Year(s): 2006
Summary: In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...


Aquatic Studies in support of the Discovery Mine Remediation Work
Principal Investigator: Ford, Bruce S
Licensed Year(s): 2005
Summary: This study involves fish sampling to determine relative abundance and levels of mercury and other metals in fish tissue in Giauque Lake, Thistlethwaite Lake and Control Lake A, as well as benthic invertebrate sampling and water quality sampling in the three lakes to complement the fish sampling. 3 sites in Giauque, 3 in Thistlethwaite and one in Control Lake A will be recorded. Captured fish will ...


Fisheries Studies For 2002 Aquatic Effects Monitoring Program
Principal Investigator: Landry, Francois
Licensed Year(s): 2002
Summary: The field work is intended to provide baseline fisheries data for four lakes (Horseshoe, Toss, Fay and Logan) and to obtain post-baseline fisheries data on eight lakes (Vulture, Kodiak, Nema, Cujo, Nanuq, Counts, and Slipper) within the Ekati claimblock...


2002 Baseline Fisheries Assessment - Ekati Ponds
Principal Investigator: Moore, Peter
Licensed Year(s): 2002
Summary: The objective of this study is to collect detailed baseline information on several seasonal streams and ponds on BHP Billiton's Ekati Claim Block, confirm the presence or absence of various fish species in the proposed areas, and determine their value as...


Diavik Diamond Mines Inc. 2002 Aquatic Effects Monitoring Program
Principal Investigator: Wytrychowski, Scott I
Licensed Year(s): 2024 2023 2022 2021 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2005 2004 2003 2002 2001
Summary: The purpose of the 2002 Aquatic Effects Monitoring Program is to initiate a long-term aquatics sampling program in order to produce a data set that will be used in trend analyses to track the overall effects of the project on the aquatic ecosystem of Lac...


2002 Panda Diversion Channel Monitoring Program
Principal Investigator: Moore, Peter
Licensed Year(s): 2003 2002 2001 2000 1999 1998
Summary: This project is to meet the requirements of the Fish Habitat Compensation Agreement between BHP and DFO. The purpose of the project is to monitor the effectiveness of created fish habitat within the Panda Diversion Channgel. Assessments will include an e...


2002 Beartooth Lake Fish-Out Program
Principal Investigator: Chubb, Derek
Licensed Year(s): 2002
Summary: The objective of the study is to remove all fish from Beartooth Lake prior to dewatering and in a manner which respects community concerns raised in previous public stakeholders meetings. The study will 1) quantify fish production, fish habitat, and prod...


Desperation Pond and Carrie Pond Fish Transfer Program
Principal Investigator: Armstrong, Allison
Licensed Year(s): 2001
Summary: The capture and processing of fishes, including biological data collection, sample analysis, and recording of field data are the responsibility of BHP based on DFO approved methods described herein. The Project Biologist will be at site during crew training, to participate in the collection of data and to ensure the quality of data. The Project Biologist will also be responsible for collating an...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


TOTAL PAGES: 1