2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


2003 Winter Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Aquatic Surveys in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes along the proposed pipeline corridor within the Gwich'in Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicini...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


2003 Winter Aquatic Surveys in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


2002 Baseline Air Quality Volatile Organic Compound (VOC) Monitoring Program in the Taglu and Parsons Lake Production Areas
Principal Investigator: Povey, Andrew
Licensed Year(s): 2002
Summary: Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...


Preliminary Reconnaissance of Wildlife and Vegetation of the Proposed Sahyoue/Edacho National Historic Park, Edacho Portion, Great Bear Lake, NT
Principal Investigator: Moore, Steve M
Licensed Year(s): 2002 2001 2000
Summary: A researcher team will travel by boats from Deline to Sahyoue Peninsula and spend 4 days collecting baseline information on wildlife and ecosystem units. Twenty sites will be assessed and classified to ecosystem type. For each site, vegetation and wildli...