86 record(s) found with the tag "land use planning" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2023 2022 2021 2020 2019
Summary: This licence has been issued for the scientific research application No.5419. This project continues the on-going monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection. Objectives are to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and active la...


Unsettling Colonial Science: Modern Architecture and Indigenous Claims to Land 1954-1998
Principal Investigator: Blanchfield, Caitlin
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5261. This research project asks how the settler colonial governments of the United States and Canada used federally-funded, cold-war era scientific research infrastructures to appropriate Indigenous lands during the second half of the twentieth century. The aim of the research is on the one hand to show the mechanisms by w...


Legislating Space: Cartographic technologies, geological data, indigenous land governance and the Mineral Resources Act of the Northwest Territories, Canada.
Principal Investigator: Becker, Matilda L
Licensed Year(s): 2019 2018
Summary: The goal of this project is to examine how the burgeoning use of digital technologies (Online Map Staking) and data (Geological data sharing) might have a cumulative impact on people’s land-based legal rights. This research is qualitative and will involve direct interaction with members of the scientific, indigenous, non-indigenous and government/non-governmental community based in Yellowknife...


Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project continues the on-going monitoring program of permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection. The specific objectives are: 1) to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and ...


The Courageous Lake Project
Principal Investigator: Wen, Marc
Licensed Year(s): 2013
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...


Enbridge Pipelines (NW) Inc. Traditional Knowledge Study
Principal Investigator: von Kuster, Jenica
Licensed Year(s): 2013 2012
Summary: The objectives of this project are: a) to take an inventory of historical and ecological/environmental resources in the area; b) to identify past, present and future uses of the area by community residents; c) to identify potential impacts from use of land within the land use area; and d) to provide follow-up mechanism for on-going communication of issues identified. The principal researche...


Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


GEM Great Bear magmatic zone/iron oxide copper-gold deposit project
Principal Investigator: Corriveau, Louise
Licensed Year(s): 2011 2010 2009
Summary: The objectives of the Great Bear/IOCG geoscience research and mapping project are to: • develop a modern geological, crustal architecture and exploration framework for polymetallic iron oxide-copper-gold (IOCG) deposit-type mineralizing systems in the Great Bear magmatic zone and new exploration methods for IOCG deposits in glaciated terrains; • validate deposit-type model for known mineral occu...


North Slave Permafrost Study: Characterizing and Predicting Discontinuous Permafrost for Climate Change Adaptation
Principal Investigator: Wolfe, Stephen A
Licensed Year(s): 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: This activity will describe and predict the occurrence of discontinuous permafrost in the northern Great Slave Lake region to assist in planning, development and maintenance of community and industry infrastructure. Future changes in climate will affect permafrost distribution, temperatures and geotechnical conditions. It is anticipated that different landscapes across the region will exhibit vary...


2008-2010 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Aquatics Component
Principal Investigator: Lawson, Nick
Licensed Year(s): 2012 2011 2010 2009 2008
Summary: The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates. Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...


TOTAL PAGES: 9