Principal Investigator:Corriveau, Louise Licensed Year(s):
2011
20102009 Summary:
The objectives of the Great Bear/IOCG geoscience research and mapping project are to:
• develop a modern geological, crustal architecture and exploration framework for polymetallic iron oxide-copper-gold (IOCG) deposit-type mineralizing systems in the Great Bear magmatic zone and new exploration methods for IOCG deposits in glaciated terrains;
• validate deposit-type model for known mineral occu...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area.
During the flights, locations of important land features will be confirmed by Glo...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region.
During the flights, locations of important land features will be confirmed by...
Principal Investigator:Moore, Steve M Licensed Year(s):
2002
20012000 Summary:
A researcher team will travel by boats from Deline to Sahyoue Peninsula and spend 4 days collecting baseline information on wildlife and ecosystem units. Twenty sites will be assessed and classified to ecosystem type. For each site, vegetation and wildli...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...