8 record(s) found with the tag "land use planning" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

GEM Great Bear magmatic zone/iron oxide copper-gold deposit project
Principal Investigator: Corriveau, Louise
Licensed Year(s): 2011 2010 2009
Summary: The objectives of the Great Bear/IOCG geoscience research and mapping project are to: • develop a modern geological, crustal architecture and exploration framework for polymetallic iron oxide-copper-gold (IOCG) deposit-type mineralizing systems in the Great Bear magmatic zone and new exploration methods for IOCG deposits in glaciated terrains; • validate deposit-type model for known mineral occu...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


Preliminary Reconnaissance of Wildlife and Vegetation of the Proposed Sahyoue/Edacho National Historic Park, Edacho Portion, Great Bear Lake, NT
Principal Investigator: Moore, Steve M
Licensed Year(s): 2002 2001 2000
Summary: A researcher team will travel by boats from Deline to Sahyoue Peninsula and spend 4 days collecting baseline information on wildlife and ecosystem units. Twenty sites will be assessed and classified to ecosystem type. For each site, vegetation and wildli...


Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...


Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...


TOTAL PAGES: 1