Principal Investigator:Smith, Sharon S Licensed Year(s):2018201720162015201420132012201120102009
2008
20072006 Summary:
The three main goals of this research are: 1) to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature) and improve characterization of terrain sensitivity in the Mackenzie Valley; 2) monitor ground temperature and active layer to detect changes in permafrost conditions resulting from surface disturbance or climate change and to improve prediction of futu...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Gaps exist in the Mackenzie monitoring network in the permafrost zones north of Norman Wells, the Mackenzie Delta region and shorelines and coastlines. Enhancement of the network is essential to provide baseline information for developments such as pipelines, highways and power lines, and to assess the impact of such development and/or climate change on the environment. In this project, temperatur...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Nichol, Susan L. Licensed Year(s):
2005
Summary:
The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...