Principal Investigator:Smith, Sharon S Licensed Year(s):
2023
2022202120202019 Summary:
This licence has been issued for the scientific research application No.5419.
This project continues the on-going monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection.
Objectives are to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and active la...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2018
201720162015201420132012201120102009200820072006 Summary:
This project continues the on-going monitoring program of permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT. This phase of the project is largely data collection.
The specific objectives are:
1) to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and ...
Principal Investigator:Wang, Baolin Licensed Year(s):2008
2007
2006 Summary:
The objective of this project is to improve understanding of triggering factors and slope failure mechanisms of landslides in the Mackenzie Valley. This knowledge will enable better environmental impact assessments of new infrastructure projects in the region.
Investigations of the 2006 site will be continued. Detailed mapping of landslides and soil sampling will be done. Three to five 1m x 1...
Principal Investigator:Couture, Rejean Licensed Year(s):2006
2005
Summary:
The main objectives of the field reconnaissance at landslide sites are as follows:
o To visit landslide sites that exhibit on-going movement in order to qualify the rate of movement;
o To identify main failure mechanisms and factors that contributed to slope failures;
o To validate previous data collected through airphoto interpretation and remote sensing techniques;
o To collect soil samples ...