30 dossier(s) trouvé(s) portant l’étiquette "land use planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Lennie-Misgeld, Peter Année(s) de permis:
2009
Résumé:
The objectives of this study are to:
- Develop vegetation classification maps for local and regional study areas around the Thor Lake project. This new mapping can be used to identify or assist in the location of sensitive or ecologically important ecosystems, culturally important plants, rare plants and rare ecosystems, and will be the basis for wildlife habitat availability mapping.
- Conduct...
chercheur principal:Maaskant, Shirley Année(s) de permis:2009
2007
Résumé:
This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...
chercheur principal:Hawkins, Jim R. Année(s) de permis:
2007
Résumé:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be performed by...
chercheur principal:Seligman, Ben Année(s) de permis:
2007
2006 Résumé:
The proposed fieldwork is an expansion of previous years' fieldwork to develop a suitable knowledge base for planning and development. In addition, some routine maintenance at Camp Farewell will be conducted. The majority of the proposed work is planned for the Niglintgak area and is focused around the Gas Conditioning Facility (GCF) and the Horizontal Directional Drilling (HDD) crossing site, as ...
chercheur principal:Martin, Sandy D Année(s) de permis:
2006
Résumé:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...
chercheur principal:Moore, Steve M Année(s) de permis:
2005
Résumé:
The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study.
Field s...
chercheur principal:Weitzner, Viviane Anita Année(s) de permis:
2004
Résumé:
The main objective of this project is to gather information from the experience of Lutsel K'e in negotiating with the government, BHP, and other mining companies to share with other indigenous communities facing large-scale mining activities on their anc...
chercheur principal:Povey, Andrew Année(s) de permis:
2003
Résumé:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...
chercheur principal:Povey, Andrew Année(s) de permis:
2003
Résumé:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
chercheur principal:Povey, Andrew Année(s) de permis:
2003
2002 Résumé:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...