12 dossier(s) trouvé(s) portant l’étiquette "land use planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Seligman, Ben Année(s) de permis:
2007
2006 Résumé:
The proposed fieldwork is an expansion of previous years' fieldwork to develop a suitable knowledge base for planning and development. In addition, some routine maintenance at Camp Farewell will be conducted. The majority of the proposed work is planned for the Niglintgak area and is focused around the Gas Conditioning Facility (GCF) and the Horizontal Directional Drilling (HDD) crossing site, as ...
chercheur principal:Smith, Sharon S Année(s) de permis:
2006
Résumé:
Gaps exist in the Mackenzie monitoring network in the permafrost zones north of Norman Wells, the Mackenzie Delta region and shorelines and coastlines. Enhancement of the network is essential to provide baseline information for developments such as pipelines, highways and power lines, and to assess the impact of such development and/or climate change on the environment. In this project, temperatur...
chercheur principal:Smith, Sharon S Année(s) de permis:
2006
Résumé:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
chercheur principal:Graburn, Larry Année(s) de permis:
2005
2004 Résumé:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
chercheur principal:Graburn, Larry Année(s) de permis:
2005
2004 Résumé:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
chercheur principal:Graburn, Larry Année(s) de permis:
2005
2004 Résumé:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
chercheur principal:Graburn, Larry Année(s) de permis:
2004
Résumé:
This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...
chercheur principal:Povey, Andrew Année(s) de permis:2004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area.
During the flights, locations of important land features will be confirmed by Glo...