Principal Investigator:Johnson, Donald S. Licensed Year(s):
2007
2006200520042003 Summary:
Project a: essentially fifth year of research (sixth-year if associated work in 2000 is counted), and seeks to continue heretofore successful investigations into the nature, substance and long-term effects of contact between Copper Inuit and Europeans/Eurocanadians in the 19th and 20th centuries utilizing sociocultural, archaeological, and economic methodologies, b. Project seeks to initiate a col...
Principal Investigator:Dube, Monique G Licensed Year(s):
2006
Summary:
The objectives of this research are three-fold: 1) to determine the natural variability of benthic invertebrate and fish communities at sites free of human impact; 2) to determine any changes in these due to mining activity relevant to regional variability; and 3) to establish dose response relationships and critical thresholds for stressors including mine effluent, ammonia, a hydrocarbon indicato...
Principal Investigator:Evans, Marlene S. Licensed Year(s):200920082007
2006
Summary:
While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relatively comprehensive in describing the major physical-chemical features of the aquatic environment, they are lacking in the descriptions of the biological features of these environments, and as a consequence, their s...
Principal Investigator:Hoos, Rick Licensed Year(s):2007
2006
Summary:
The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project.
Overland t...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Wen, Marc Licensed Year(s):2013201220112010200920082007
2006
200520042003 Summary:
The proposed fieldwork is intended to characterize baseline and post-baseline conditions in the lakes and streams near areas of current and pending mining activity. In anticipation of future infrastructure development, baseline data will be collected in those areas. Fish populations of the Panda Diversion Channel (PDC) will continue to be monitored, and compared with the productivity of two nearby...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits.
All of the aquati...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
20042003 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
20042003 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...