Principal Investigator:Prather, Colleen Licensed Year(s):2021
2020
2019201820172016201520142012201120102009200820072006200520042002200120001999 Summary:
This licence has been issued for the scientific research application No.4635.
The objective of this research are to conduct environmental monitoring of wildlife, vegetation, air quality, hydrology, and aquatic effects in the Snap Lake study area. The research team will collect incidental observational data of wildlife near the Snap Lake Mine.
Through this project the research team will coll...
Principal Investigator:Elliott, Barrett R Licensed Year(s):2017
2015
Summary:
The Northwest Territories Geoscience Office in the Department of Industry, Tourism and Investment (ITI) has developed a large collaborative research project to determine the detailed glacial history and permafrost conditions of the central Slave Geological Province.
The project goals are to:
- stimulate the next round of diamond and metals exploration in the Slave Province
- collect permafr...
Principal Investigator:Reford, Stephen Licensed Year(s):2011
2010
2008 Summary:
The objective of the Darnley Bay Resources Ltd. 2010 - 2012 Field Program is to collect additional information on the Darnley Bay Gravity Anomaly and to assess kimberlite pipe targets. Six field programs have been proposed (geological prospecting and sampling, claim staking, ground geophysical surveys, bathymetric surveys and two drilling programs) and data collected will aid in DBR's interpretati...
Principal Investigator:Carroll, Paul Licensed Year(s):
2007
Summary:
, in accordance to the EISC RECOMMENDATIONS in late October 2007. Fieldwork is being licenced confined to March-April 2008.
The purpose of this project is to conduct Global Positioning Satellite (GPS)-based gradiometer magnetometer surveys, by JVX on behalf of Diadem. Within the mineral claims, 28 potential targets have been identified in priority sequence to be surveyed. The number of surveys ...
Principal Investigator:Maric, Robert Licensed Year(s):
2001
Summary:
The research team will be based out of Yellowknife. Travel to the Ekati Mine site will be by helicopter; travel on site will be on foot. The research team will be in the field for approximately seven days. Characterization of the hydrologic balance of the system under investigation will be completed by the collection of several hundred water samples (each with an approximate volume of 30 ml) at d...
Principal Investigator:English, Michael C Licensed Year(s):200320022001
2000
Summary:
Tthe objective of this study is to continue research examining the hydrological and energy budget of small arctic esker lake basin during the spring melt period. The intent of this research is to understand the relationship between the energy budget and changes in soil moisture, rates of evapotranspiration, and changes in water discharge from a small tundra basin underlain by permafrost. Transpo...
Principal Investigator:Stubley, Michael Licensed Year(s):199619951994
1993
199219911990 Summary:
The research team will examine, document and take samples of the surface outcrops (rocks) in the study area. This information will be recorded on a map which will summarize the geological rock types and mineral resources of the area....