Principal Investigator:Lafleur, Peter M Licensed Year(s):2018201720162015201420132012
2011
2010200920082007200720052004 Summary:
The objective of this study is to study how important greenhouse gases, carbon dioxide and methane, are exchanged between tundra surfaces and the atmosphere. These exchanges will be measured over various tundra types and relate them to environmental variables such as soil properties and weather, in hopes of understanding more about how future climate change will impact the land surface and how th...
Principal Investigator:Draho, Bob Licensed Year(s):
2010
2009 Summary:
The objectives of this four day field survey is to inspect the 4 hydrology stations and 1 meteorology station to ensure they are in working order, repair if required, and download site-specific weather and stream flow data from the stations.
Equipment at each hydrostation consists of a datalogger (to record) and a pressure transducer (to detect fluid pressure and produce a signal related to the...
Principal Investigator:Draho, Bob Licensed Year(s):
2009
2008 Summary:
This licence is being issued for the scientific research application No. 1121.
The objectives this research to document the time history of flow in Matthews Creek and site-specific weather data for the Matthews Lake Gold Project. This will be done in three site visits.
During the first site visit, researchers will to reinstall creek monitoring instruments, and inspect and download the exist...
Principal Investigator:Hoos, Rick Licensed Year(s):
2007
Summary:
The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...
Principal Investigator:Standafer-Pfister, Shirley Licensed Year(s):
2007
2006 Summary:
The objectives of the hydrological program are to collect and store creek-discharge data in conjunction with creek-stage elevations in order to increase the accuracy of the stage-discharge relationship and prepare a time history of flow. The objectives of the meteorological program are to install instrumentation to collect site-specific meteorological data and to begin a site monitoring program.
...
Principal Investigator:Spence, Christopher Licensed Year(s):2017201620122011201020092008
2007
Summary:
The objective of the research is to determine the water cycle processes in lakes and streams affecting Baker Creek and similar streams, and more generally to understand how small scale processes influence those of larger areas.
Field studies at Baker Creek, a typical Canadian Shield stream that drains ~130 km2 into Great Slave Lake, will focus on the spring melt and summer seasons. Existing i...
Principal Investigator:Bekhuys, Tim Licensed Year(s):2006
2005
Summary:
De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Mielko, Corrinne Licensed Year(s):
2004
Summary:
Lakes and wetlands in the Canadian Shield have important storage effects that greatly modify runoff generation from the basins. The project objective is to understand and quantify the hydrological processes operating at the basin scale in a boreal Shelf...
Principal Investigator:Sharpe, Seßn Licensed Year(s):
2003
Summary:
This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...