Matthews Creek 2009 hydrometeorological survey

Regions: North Slave Region, South Slave Region

Tags: hydrology, meteorology

Principal Investigator: Draho, Bob (4)
Licence Number: 14535
Organization: EBA Engineering Consultants Ltd.
Licensed Year(s): 2009 2008
Issued: Jun 11, 2009
Project Team: Bob Draho (Project Manager, EBA Engineering Consultants Ltd.), Jamie Stirling (Project Scientist, EBA Engineering Consultants Ltd.), Travis Miguez (Junior Scientist, EBA Engineering Consultants Ltd.)

Objective(s): The objectives this research to document the time history of flow in Matthews Creek and site-specific weather data for the Matthews Lake Gold Project.

Project Description: This licence is being issued for the scientific research application No. 1121. The objectives this research to document the time history of flow in Matthews Creek and site-specific weather data for the Matthews Lake Gold Project. This will be done in three site visits. During the first site visit, researchers will to reinstall creek monitoring instruments, and inspect and download the existing meteorological station. During the second site visit, researchers will download creek monitoring equipment and maintain/repair equipment if required. The objective of the third site visit is to remove the equipment in Matthews Creek and download data from the meteorological station. Seasonal maintenance of the meteorological station will also occur during the third site visit. A summary report of results will be available to interested communities. The fieldwork for this study will be conducted at Matthews Creek (between Courageous Lake and Matthews Lake) from June 11 to October 9, 2009.