chercheur principal:Danby, Ryan K Année(s) de permis:
2019
2018 Résumé:
The two main objectives are: to map changes in vegetation productivity on an annual basis across the Bathurst caribou herd’s range using satellite imagery obtained from NASA’s MODIS sensor (available since 2000) and analyze these data to identify where the most significant changes have occurred; and to collect and analyze data on the growth, establishment, and mortality of shrubs and trees over th...
chercheur principal:Chen, Wenjun Année(s) de permis:
2014
2013 Résumé:
The goals of this research project are:
1. To fill the information gap on Bathurst caribou summer range conditions using satellite remote sensing data and community-based ground vegetation monitoring
2. To develop a cumulative impact assessment method that makes cumulative impact assessment possible even if data are incomplete and provides timely feedback for guiding the refinement of monitoring...
chercheur principal:Panayi, Damian Année(s) de permis:20182017201620152014
2013
201220112010 Résumé:
The objective of this study is to describe the terrestrial and aquatic environment in the Yellowknife River between Prosperous Lake and Bluefish Lake as per the Fisheries Authorization and the Water Licence. This may include investigating vegetation, water quality, benthic invertebrate populations, and fish. The results will be used to determine the most suitable means of fish habitat compensation...
chercheur principal:Harris, Katherine M. Année(s) de permis:201720162014
2013
201220112010200920082006200520042003 Résumé:
The objective of this research project is to collect baseline environmental information for future environmental effects monitoring.
Surveys may include assessments of fish, fish habitat, benthic invertebrates, plankton, water and sediment quality, wetlands and geochemistry. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water qualit...
chercheur principal:Moore, Steve M Année(s) de permis:
2010
Résumé:
The 2010 baseline environmental studies will include the following:
1) A rare plant survey to be conducted in mid July (approximate) to identify presence of rare plants within the local study area.
2) An ecosystem mapping field component to be carried out in June and mid July (approximate) to describe existing habitat types within the local study area.
Rare plant surveys will be conducted in ...
chercheur principal:Morrison, Scott Année(s) de permis:
2007
200620052004 Résumé:
Consistent with the DFO authorization, the major objectives of this study are to:
1) to provide annual documentation of shoal habitat use by Lake Trout in the vicinity of the mine site. FA Clause 8.1.3
2) to ground truth hydroacustic equipment by capturing fish to identify species, collect life history data, tag, and then release
As stated in the Authorization for Works or Undertakings Affec...
chercheur principal:Van Humbeck, Joe Année(s) de permis:
2007
Résumé:
The objective of the 2007 portion of the project is to monitor control sites and treatment sites, and collect information on the habitat utilization. Data collected will be used to evaluate the continued success and effectiveness of the habitat construction and enhancement.
Field crews will fly to Matthews Lake, landing either on the runway or the lake. The Treeline Lodge, where the research te...
chercheur principal:Hamm, Sharleen Année(s) de permis:
2006
Résumé:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
chercheur principal:Uren, Shane Année(s) de permis:
2004
Résumé:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
chercheur principal:Moore, Peter Année(s) de permis:2004