33 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

F-36 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Pointed Mountain, NWT, BP Canada Energy Company
Principal Investigator: Johnson, Pascale
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...


Modelling the flow and storage components in the lower Liard River valley
Principal Investigator: Quinton, William L.
Licensed Year(s): 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2001
Summary: This study is a continuation of a project that began in 2001. The researchers are studying the flow and storage of water in the Scotty Creek watershed. The data they collect will help them to create a model that will do a better job of estimating the volume and timing of basin runoff in wetlands in discontinuous permafrost terrain. The information they have collected so far suggests that peat p...


Supplemental Phase II Environmental Site Assessment, N-01 Wellsite
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005 2004
Summary: The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...


2004 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...


Post Construction Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Kustan, Ed
Licensed Year(s): 2004
Summary: The purpose of this monitoring program is to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of eight permanent sampling transects were established along the pipeline right-of-way; two in...


Active Layer Monitoring Network in the Mackenzie Valley
Principal Investigator: Nixon, Mark
Licensed Year(s): 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990
Summary: This ongoing survey examines permafrost so as to better understand how the active layer varies locally and regionally and how it will respond to environmental change, including but not restricted to climate change. The research team will survey from For...


2003 Fort Simpson Summer Field Geotechnical Investigation Program - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


TOTAL PAGES: 4