49 record(s) found with the tag "fish" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Matthews Lake and Area Fish Habitat Restoration Program
Principal Investigator: Moore, Peter
Licensed Year(s): 2004 2003
Summary: Dillon Consulting Limited has been retained to complete habitat restoration activities at the historic Salmita Mine site at Matthews Lake. The 2003 phase of this project is to conduct baseline aquatic assessments at the Matthews Lake site to identify pr...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licensed Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


Environmental Survey for EnCana ECA et al Begadeh Exploratory Wellsite Project
Principal Investigator: Newyar, Chuck
Licensed Year(s): 2003
Summary: This survey is required to obtain specific environmental information to be used in support of land use permit and water licence applications for EnCana's proposed winter drilling program within the Tulita District of the Sahtu Settlement Area. Emphasis...


Environmental Assessment for Drilling and Access Development in the Fort Liard Area
Principal Investigator: Mears, Margaret
Licensed Year(s): 2002
Summary: Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...


Izok Project Environmental Baseline Studies
Principal Investigator: Hubert, Ben
Licensed Year(s): 2002
Summary: The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


Fall 2001 Mackenzie Delta Aquatics Survey
Principal Investigator: Jalkotzy, Peter
Licensed Year(s): 2001 2000
Summary: Selection of lakes for this program was based on: size (diameter/depth); fish over-wintering potential; connectivity with other waterbodies; and the likelihood of intensive (3D) seismic activity occurring within the lakes during the winter of 2001-02. A total of 6 lakes have been identified for inclusion in the survey. Three alternate lakes have also been identified in the event that those selec...


Aquatic Assessment
Principal Investigator: Monita, Darwin
Licensed Year(s): 2001
Summary: The aquatic assessment is scheduled for September and October, 2001, and will focus on three lakes in the Chevron Canada Resources 2001/2002 seismic program areas in the Ellice 3-D, Mallik 3-D and Ogruknang 3-D blocks. All lakes examined will exceed 400m in width. No field camps will be used, all garbage will be packed out, and all human waste buried. The field crew will include a senior fisheri...


An Aquatic Effects Study for the Ferry Crossings near Tsiigehtchic and Ft. McPherson, NT
Principal Investigator: Parlee, Brenda L
Licensed Year(s): 2002 2001
Summary: The Aquatic Effects Study will include the general components of fisheries, water quality, river hydraulics, ferry landing operations, and traditional knowledge (TK). The specific Study objectives are as follows: (1) Complete an assessment of fish habitat quality including photographs; (2) Determine which fish species utilize the area; (3) Collect Gwich'in TK in relation to fish and fish habitat. ...


TOTAL PAGES: 5