188 record(s) found with the tag "environmental assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

The Courageous Lake Project
Principal Investigator: Wen, Marc
Licensed Year(s): 2013
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data collection is planned to characterize the environmental (physical and biological) and social and economic setting in the proposed project area. Specifically, data collection is planned to characterize the following environmental components: air quality, noise, hydrology, bathymetry, hydrogeology, a...


Phase III ESA & RAP for Stark Lake Exploration Site, NT
Principal Investigator: Barnes, Keith G
Licensed Year(s): 2013
Summary: The objectives of this year’s work program are to: 1. Complete a Phase III Environmental Site Assessment of the site, to further assess and delineate areas of concern on the site to support Remedial Action Plan development; 2. Complete a hazard assessment of the Stark Lake Site to support the development of a health and safety plan, and ensure that the Crown’s due diligence in regards to ...


Great Slave Lake Area Mines: 2013 Sampling Program
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2013 2012 2011 2010
Summary: The objective of the 2013 Great Slave Lake Mines Sampling Program is to assist Aboriginal And Northern Development Canada-Contaminants And Remediation Directorate (AANDC-CARD) with its ongoing work to clean up abandoned mine sites across the Northwest Territories. The program aims to collect additional environmental data which will be used to confirm current site conditions and to assist with fina...


Phase III ESA - Fort Simpson RCMP Detachment
Principal Investigator: Schulz, Eva
Licensed Year(s): 2013
Summary: The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank. Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...


Phase I/II/III ESAs and Risk Assessment
Principal Investigator: Hamilton, Melissa M
Licensed Year(s): 2013
Summary: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Supplemental Environmental Site Assessments along the Canol Trail, NT
Principal Investigator: Livingstone, Steve
Licensed Year(s): 2013 2012 2010
Summary: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


Phase II Environmental Assessments of six sites in the Northwest Territories
Principal Investigator: Winch, Susan
Licensed Year(s): 2012
Summary: The objective of this research project is to conduct Phase II Environmental Site Assessments (ESAs) at six locations located within the Northwest Territories (NT). The purpose of field investigations at Caribou Point, Crestaurum Mine, Sun-Rose Claim Group, Thompson-Lundmark Mine, Wrigley Point, and Dome Lake is to determine the current environmental and physical conditions at each site and to red...


Combined Phase I/II Environmental Site Assessment of Ten Sites; Norris Lake Gold Exploration Site, River Lake Portage Dump, Wijinnedi Lake Exploration Site, Martin House Fuel Cache, Pine Point Railbed
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2012
Summary: The objective of this study is to complete comprehensive site investigations at each location (10 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will f...


Great Bear RIver Summer of 2012 Site Assessments
Principal Investigator: Geddes, Robert B
Licensed Year(s): 2012 2011
Summary: The assessment is designed to delineate the horizontal and vertical extent of uranium contaminated soil at sites located along the Great Bear River portion of the Northwest Transportation Route (NTR). The soil quality and quantity information gathered during this assessment is required to assist in the development of future remediation plans for this segment of the NTR. The proposed tasks are a...


Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


TOTAL PAGES: 19