188 dossier(s) trouvé(s) portant l’étiquette "environmental assessment" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Land Use and Regulatory Permitting - Colville Lake Airport
chercheur principal: Koke, Paul Koke E
Année(s) de permis: 2009
Résumé: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Colville Lake Airport. As a result, it is required that a...


Environmental Screening of the Inuvik Airport Runway Extension
chercheur principal: Thomas, Craig J
Année(s) de permis: 2009
Résumé: The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...


Phase II Environmental Site Assessment of ten (10) site along the Canol Trail (NM050)
chercheur principal: Hadley, Katherine
Année(s) de permis: 2009
Résumé: The purpose of the Phase II ESAs is to further determine the current environmental and physical conditions at 10 sites along the Canol Trail and to reduce data gaps and allow development of the appropriate remediation strategies and costs. This will include the identification and quantification of environmental impacts to soil, sediment, surface water and groundwater, as well as the identificatio...


Ogruknang Drilling Field Assessment
chercheur principal: Maaskant, Shirley
Année(s) de permis: 2009 2007
Résumé: The assessment component of this project will focus on identifying and documenting valued biophysical and archaeological components in the vicinity of proposed winter activities (i.e. proposed roads, well sites, and campsites). Information collected during the study will be used in planning and determining appropriate locations for 2009/2010 drilling activity. Recommended set-back distances will b...


Dezé Energy Corporation Ltd. Taltson Expansion Project
chercheur principal: Azzolini, Louie
Année(s) de permis: 2009 2008
Résumé: This licence is being issued for the scientific research application No. 1124. This is a three part study with separate objectives for each. The objectives are as follows: 1) The Fish Study: Evaluate the impacts associated with four locations requiring in-stream works; quantify and qualify fish habitat values at each of the four locations; identify potential locations to improve existing fish...


The Rules of Engagement? NWT Negotiated Agreements and Environmental Assessment
chercheur principal: Lukas-Amulung, Sandra E
Année(s) de permis: 2008
Résumé: The objectives of this research are to: describe the problematic overlap between NWT environmental assessment (EA) and negotiated agreements (NA); prepare several project review process models to explore possible relationships between NA and EA; evaluate the models and select a preferred model during an expert workshop; and assess the suitability of the preferred model using the views of First Nat...


MGM Energy Corp. Summer Field Assessment and Advance Barging and Staging Project: 2008-2011
chercheur principal: Miller, Glenn D
Année(s) de permis: 2008
Résumé: The objective of this research is to identify and document valued vegetation components in the vicinity of proposed winter activities. Each selected site will be assessed for important vegetation components, such as the potential for: rare plants and vegetation communities. The research will include photo documentation and visual observations to characterize each site for vegetation features. Inf...


Canol Trail - Logistics Plan Development and Inventory
chercheur principal: Mitchell, Scott
Année(s) de permis: 2008
Résumé: The overall objective of the program is to reduce liability of the Canol Trail by developing and implementing a remediation and/or risk management plan to mitigate existing or potential risks to human health and the environment from the trail. The primary focus will be on developing a logistics plan and inventorying materials, risks and hazards along the site for future assessments. The rese...


Detailed Environmental Site Assessment - Sawmill Bay
chercheur principal: Livingstone, Stephen
Année(s) de permis: 2008
Résumé: This license has been issued for the scientific research application #856. This research will collect environmental samples, and quantify and categorize waste materials left at the Sawmill Bay site in preparation for site remediation. Research will involve sediment, surface water, soil, and groundwater sampling. A detailed explanation of the research methodology can be found in the research a...


Complexities surrounding multijurisdictional environmental assessment: Negotiating a place for public participation and learning
chercheur principal: Fitzpatrick, Patricia
Année(s) de permis: 2008
Résumé: The purpose of this research is to understand how different environmental assessment (EA) processes across Canada are harmonized, and how harmonization impacts public participation. The Mackenzie Gas Project is the most complex assessment in this regard, makes an ideal study model of EA. The first objective of this research, that has already been completed, involves documenting the frequency of...


TOTAL PAGES: 19