Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...
Principal Investigator:Neufeld, Lori Licensed Year(s):
2009
Summary:
WorleyParsons, on behalf of Imperial Oil, is planning to conduct a remote sensing pilot project through use of a fixed-wing aircraft to capture environmental information on approximately 100 former drilling sites, as well as some former staging areas, campsites, artificial islands in the Beaufort Sea and other facilities located in the Northwest Territories. The purpose of the project is to determ...
Principal Investigator:Millman, Peter M Licensed Year(s):
2007
2006 Summary:
The objective of the program is to observe surface geological features and document these observations. From a geological perspective the objective of the project is to complete a reconnaissance of the Cambrian and Proterozoic sections in 4 areas.
Field operations will take approximately 6 days to complete. The project team will mobilize by helicopter daily from Norman Wells for the western...
Principal Investigator:Hoos, Rick Licensed Year(s):2007
2006
Summary:
The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project.
Overland t...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):2002200120001999
1998
19971996199519941993 Summary:
The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...
Principal Investigator:Colpron, Maurice Licensed Year(s):
1997
Summary:
The project will be conducted from 10-12 tent fly-camps within the study area. Each camp will be set-out by helicopter (out of Norman Wells) and will be of a duration of approximately 5-7 days. Our work will consist of daily hikes from our camps, during which our observations of the rock types and mineral occurrences will be noted on 1:50,000-scale topographic maps and air photos. Data collectio...