Principal Investigator:Belland, Darlene Licensed Year(s):
2017
20162015201420132012 Summary:
The objective of this project is to conduct ongoing monitoring and assessment programs, including areas in the Mackenzie River Special Management Zone (SMZ), for surface water.
Surface water samples will be collected from selected lakes, ponds, rivers, and streams. Selected water bodies in EL470 have already undergone bathymetric assessment and sampling.
ConocoPhillips will communicate, in ...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2006
2006
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 65 people. Secondary access to the investigation s...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The geotechnical investigation program involves drilling or excavating to collect soil samples at specific sites and the installation of thermal recording devices. Boreholes or excavations will be drilled at approximatley 30-35 sites (22 borrow sites, 4...
Principal Investigator:Kiss, Frank Licensed Year(s):2003200220012000
1999
Summary:
The purpose of this study is to improve the public knowledge and understanding of the geology of this area, as no publicly available magnetic survey coverage exists. This survey is entirely airborne, with no land access. The aircraft will be equipped with a state of the art magnetometer and navigation systems, including Global Positioning System (GPS). The aircraft will be operating from existing ...
Principal Investigator:Colpron, Maurice Licensed Year(s):
1997
Summary:
The project will be conducted from 10-12 tent fly-camps within the study area. Each camp will be set-out by helicopter (out of Norman Wells) and will be of a duration of approximately 5-7 days. Our work will consist of daily hikes from our camps, during which our observations of the rock types and mineral occurrences will be noted on 1:50,000-scale topographic maps and air photos. Data collectio...
Principal Investigator:Harry, David Licensed Year(s):
1984
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....