70 dossier(s) trouvé(s) portant l’étiquette "infrastructure planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Chiperzak, Doug Année(s) de permis:
2018
Résumé:
The objectives of the fisheries and hydrotechnical assessments is to collect the necessary data to inform the design of new crossing structures to be built.
At each crossing location, fish Habitat will be assessed (Gunghi Creek, Hwy 8 km 266.1, and Hwy 8 km 147.0; Oscar Creek and Great Bear River; and, Frank Channel and Behchoko Access Road). Fish habitat will be assessed by using cross-channel...
chercheur principal:Wolfe, Stephen A Année(s) de permis:20192018
2017
2016201520142013201220112010 Résumé:
This activity describes and predicts the occurrence of discontinuous permafrost in the northern Great Slave Lake region to assist in planning, development and maintenance of community and industry infrastructure. Changes in climate are affecting permafrost distribution, temperatures and geotechnical conditions. Different landscapes across the region are exhibiting varying responses to warming. Thi...
chercheur principal:Heck, Darren M Année(s) de permis:
2013
2012 Résumé:
The objectives of this project are:
a) Inventory of historical and ecological resources in the area;
b) past, present and future uses of the area by community residents;
c) identification of potential impacts of use of the land use areas supporting access and maintenance (i.e. camps, trails, buffer areas and work areas); and
d) provide follow-up mechanism for on-going communication of issues i...
chercheur principal:Patterson, R. Tim Année(s) de permis:
2012
20112010 Résumé:
Through analysis of sediment/water interface samples, freeze cores, and dendrochronology the researchers intend to:
i) develop a comprehensive climatic history along a 2° latitudinal gradient in the central NT, variously based on an analysis of freeze cores from lakes along the route of the Tibbitt to Contwoyto Winter Road (TCWR);
ii) determine the relationship between modern lake catchments an...
chercheur principal:Gordon, James Jr Année(s) de permis:
2012
Résumé:
This research project is a part of a student project under the Aurora College Environment and Natural Resources Training Program (ENRTP). The objective of this project is to find out when, what, historical background, and animals harvested at Husky Lakes camp/cabin area, and to ask how would the Inuvik to Tuk All-Weather Highway affects their camp/cabin locations.
Five survey questions will be...
chercheur principal:Fabijan, Michael F Année(s) de permis:
2012
Résumé:
The study will focus on collecting information from Inuvialuit elders and harvesters. Of particular interest are community issues and concerns, local knowledge and recommendations with respect to the potential effects of the proposed project.
Participants will be asked to discuss their perceptions of the potential effects of the project on community health and wellness, their knowledge of tradi...
chercheur principal:Krizan, Julia Année(s) de permis:
2011
Résumé:
A Fish Habitat Assessment and an Archaeological Assessment are required for the proposed Inuvik to Tuktoyaktuk Highway. A Fish Habitat Assessment and an Archaeological Impact Assessment Report will be developed with data obtained from the proposed highway corridor during fall 2011.
IMG-Golder Corp. is proposing to carry out a fish habitat and archaeological assessment program along the highway ...
chercheur principal:Johnson, Mary Ann Année(s) de permis:
2011
Résumé:
The objective of this project will be to verify baseline environmental information available for the highway route. The field program will focus on a flyover of the proposed highway route to verify the baseline information that is available for potential fish and wildlife habitat as well as plant communities. The environmental field program will be conducted at the same time as the archaeological ...
chercheur principal:Kors-Olthof, Rita I Année(s) de permis:2014
2011
Résumé:
The goals of the hydrotechnical research are to:
- learn if there are possible problem areas due to water or ice along the proposed road;
- choose the best proposed bridge location so that a new bridge won't wash out like the temporary one does; and
- decide on length of bridge so that abutment locations can be chosen for later geotechnical drilling sites.
The goals of the geotechnical resea...
chercheur principal:Lennie-Misgeld, Peter Année(s) de permis:
2011
2010 Résumé:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...