11 dossier(s) trouvé(s) portant l’étiquette "infrastructure planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Martin, Sandy D Année(s) de permis:
2006
Résumé:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
chercheur principal:Povey, Andrew Année(s) de permis:
2005
200420032002 Résumé:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
chercheur principal:Povey, Andrew Année(s) de permis:2004
2003
2002 Résumé:
The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...
chercheur principal:Povey, Andrew Année(s) de permis:2004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area.
During the flights, locations of important land features will be confirmed by Glo...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region.
During the flights, locations of important land features will be confirmed by...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
chercheur principal:Hong, Tom Année(s) de permis:
2002
Résumé:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...