11 dossier(s) trouvé(s) portant l’étiquette "infrastructure planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:d'Entremont, Marc Année(s) de permis:
2004
Résumé:
The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...
chercheur principal:Butler, Helen Année(s) de permis:
2003
Résumé:
The objective of this project is to determine if Pelzer Pond, at the Ekati Diamond Mine site, is a fish bearing water body. Previous fishing efforts conducted as part of a baseline study in 1999 indicated that there were no fish in the pond. The resear...
chercheur principal:Povey, Andrew Année(s) de permis:2004
2003
2002 Résumé:
The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...
chercheur principal:Povey, Andrew Année(s) de permis:20052004
2003
2002 Résumé:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
chercheur principal:Hong, Tom Année(s) de permis:
2002
Résumé:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
chercheur principal:Ash, Gary R. Année(s) de permis:
1981
Résumé:
To identify major environmental concerns of the proposed Hydroelectric development as related to fish....
chercheur principal:Nieminen, G.A. Année(s) de permis:
1980
Résumé:
To undertake environmental field studies relating tothe environmental assessment of a mine/mill development and a winterd access road. The studies will include fisheries studies, vegetation identification, soil sampling, and wildlife habitat assessment....
chercheur principal:McGregor, C.A. Année(s) de permis:
1976
Résumé:
Parsons Lake - a quantitive description of vegetation with organic content, ice content and moisture content. Sabine Peninsula - preliminary terrain sensitivity classification for use in planning transporation facilities....