Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. At this time, a...
Principal Investigator:d'Entremont, Marc Licensed Year(s):
2004
Summary:
The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Wright, Fred J Licensed Year(s):2012201120102009200820072006
2004
Summary:
This pilot study will address identified gaps in knowledge critical for assessing the impacts of regional oil and gas development in the vicinity of the Mackenzie Delta and Richards Island, with respect to exploration and drilling activities, well-head a...
Principal Investigator:Graburn, Larry Licensed Year(s):2005
2004
Summary:
The geotechnical site investigation program involves drilling or excavating to collect soil samples at specific sites. This work includes drilling approximately 74 boreholes or excavations at 23 sites (18 granular deposit sites, 4 overland sites, and 1 r...
Principal Investigator:Ferguson, Gordon Licensed Year(s):
2003
Summary:
Following environmental impact assessments, the National Energy Board and the Mackenzie Valley Land and Water Board granted approvals to Paramount Resources Ltd. for the construction of specific infrastructure within the Significant Discovery Area. Atta...