70 record(s) found with the tag "infrastructure planning" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Licence #4036
Principal Investigator: Tucker, Nigel
Licensed Year(s): 1984
Summary: (1) To examine the "state-of-the-art" regarding site selection techniques for energy facilities. (2) To visit some of the locations which have previously been identified as potential shorebase sites....


Slave River basin fish study
Principal Investigator: Ash, Gary R.
Licensed Year(s): 1981
Summary: To identify major environmental concerns of the proposed Hydroelectric development as related to fish....


Licence #2603
Principal Investigator: Nieminen, G.A.
Licensed Year(s): 1980
Summary: To undertake environmental field studies relating tothe environmental assessment of a mine/mill development and a winterd access road. The studies will include fisheries studies, vegetation identification, soil sampling, and wildlife habitat assessment....


Licence #2134
Principal Investigator: Katopodis, C.
Licensed Year(s): 1977
Summary: Topographic and hydrometric survey for the design of weirs to assit fish in entering culverts....


Licence #2059
Principal Investigator: McGregor, C.A.
Licensed Year(s): 1976
Summary: Parsons Lake - a quantitive description of vegetation with organic content, ice content and moisture content. Sabine Peninsula - preliminary terrain sensitivity classification for use in planning transporation facilities....


Licence #2005
Principal Investigator: McKinnon, Greg
Licensed Year(s): 1976
Summary: To assess the short and long term effects of highway construction on the aquatic resources of three streams....


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


Licence #1981
Principal Investigator: Drabinsky, Ken
Licensed Year(s): 1976
Summary: To develop an Arctic terrain classificaiotn which will provide the basis for a useable terrain evaluation for settlement sites. Project includes: 1) the description and mapping of basic terrain units in and around Rankin Inlet, 2) the construction of a lands systems classification, 3) an evaluation of the terrain units as sites for vairous functions, and 4) examina...


Licence #1939
Principal Investigator: Wooley, David R.
Licensed Year(s): 1976
Summary: To carry out aerial reconnaissance studies (locating and counting ungulates) associated with environmental input into pipeline design and location....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 7