8 dossier(s) trouvé(s) portant l’étiquette "infrastructure planning" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Povey, Andrew Année(s) de permis:
2004
20032002 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
chercheur principal:Graburn, Larry Année(s) de permis:2004
2003
Résumé:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
chercheur principal:Graburn, Larry Année(s) de permis:2004
2003
Résumé:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
chercheur principal:Graburn, Larry Année(s) de permis:2004
2003
Résumé:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...
chercheur principal:Graburn, Larry Année(s) de permis:2004
2003
Résumé:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...
chercheur principal:McKinnon, Greg Année(s) de permis:
1976
Résumé:
To assess the short and long term effects of highway construction on the aquatic resources of three streams....
chercheur principal:Jasper, J.N. Année(s) de permis:
1976
Résumé:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
chercheur principal:Davison, D.M. Année(s) de permis:
1975
Résumé:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....