Principal Investigator:Nearing, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5047.
The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):
2013
201220112010 Summary:
The objective of the 2013 Great Slave Lake Mines Sampling Program is to assist Aboriginal And Northern Development Canada-Contaminants And Remediation Directorate (AANDC-CARD) with its ongoing work to clean up abandoned mine sites across the Northwest Territories. The program aims to collect additional environmental data which will be used to confirm current site conditions and to assist with fina...
Principal Investigator:Winch, Susan Licensed Year(s):
2012
Summary:
The objective of this research project is to conduct Phase II Environmental Site Assessments (ESAs) at six locations located within the Northwest Territories (NT). The purpose of field investigations at Caribou Point, Crestaurum Mine, Sun-Rose Claim Group, Thompson-Lundmark Mine, Wrigley Point, and Dome Lake is to determine the current environmental and physical conditions at each site and to red...
Principal Investigator:Trusler, Scott Licensed Year(s):
2012
2008 Summary:
The objectives of the research studies are the following: refine understanding of baseline conditions; provide input to design mitigation; evaluate potential changes in the environment in relation to the Izok Project; and contribute to the ongoing data collection of the Arctic environment.
The Minerals and Metals Group (MMG) Canada team of environmental consultants will collect and review exist...
Principal Investigator:Hadley, Katherine Licensed Year(s):
2009
Summary:
The purpose of the Phase II ESAs is to further determine the current environmental and physical conditions at 10 sites along the Canol Trail and to reduce data gaps and allow development of the appropriate remediation strategies and costs. This will include the identification and quantification of environmental impacts to soil, sediment, surface water and groundwater, as well as the identificatio...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):2007
2006
Summary:
Indian and Northern Affairs Canada (INAC) has assumed responsibility for the contaminated sites of the Indore and Beaverlodge (Hottah) Mines and is in the process of characterizing the ecological and human health and safety risks associated with the sites in order for remediation strategies to be developed.
The work involves manual sampling and measurement with minimal disturbance of site cond...
Principal Investigator:Kustan, Ed Licensed Year(s):
2005
Summary:
The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...