Principal Investigator:Falck, Hendrik Licensed Year(s):
2003
2002 Summary:
The purpose of this project is to develop and compile an inventory, and improve the understanding of mineral deposits related to granite intrusions in the western Northwest Territories. Understanding the concentrations of metals in the environment is im...
Principal Investigator:Moore, Peter Licensed Year(s):
2003
Summary:
As part of the 2003 Baker Creek Environmental Monitoring Program, Dillon Consulting Limited will conduct fish habitat assessments at Baker Creek, Yellowknife. Benthic invertebrates will be sampled at each of 8 sampling sites using multi-plate artificial...
Principal Investigator:Evans, Marlene S. Licensed Year(s):
2003
1998 Summary:
This study is based on earlier research conducted by the Department of Fisheries and Oceans which found that fish in many lakes in the Mackenzie River Basin had high mercury concentrations. This study examines the environment in which the fish live in o...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on all major streams in the proposed pipeline corridor. The proposed survey will begin in mid-September and continue until late December, 2001 and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on describing h...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...
Principal Investigator:Sawetsky, Les Licensed Year(s):
2001
Summary:
A detailed data collection program will be undertaken on 20 streams. All major streams will be included in the survey. The proposed survey will begin in late July and continue until early September 2001, and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on descr...
Principal Investigator:English, Michael C Licensed Year(s):
2000
19961995 Summary:
The field crew will live on the delta for approximately 8-9 weeks at a site established by the principal investigator in 1997 on Steamboat Channel. Transportation will be by boat. Three channels will be studied in detail. At each study site the researchers will measure the speed of the flow using an electronic velocity meter, measure the cross sectional profile of the channel with tape and rod ...
Principal Investigator:Schunke, Ekkehard Licensed Year(s):
2000
199419921990 Summary:
The researcher will measure discharge, run-off velocity, sediment load, dissolved load and microclimate parameters (air and ground temperatures, relative humidity, evaporation, precipitation and radiation) in small valleys of James Creek. They drive to the location in a 3/4 ton truck which is parked in an abandoned quarry near the road. They walk to their data collection sites. The observations...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2004200320022001
2000
2000
1999 Summary:
This project investigates the the distribution and amount of near-surface ice in sediments of the Mackenzie delta area near Inuvik. Sites near Inuvik will be accessed via road and sampled using a hand held power auger. Soil cores will be removed and taken to the Inuvik Research Center for subsequent examination. The thickness of permafrost will be measured by near-surface water jet drilling which ...
Principal Investigator:Pettit, George Licensed Year(s):
1999
1995 Summary:
The overall goal of this project is to collect a variety of soil samples from easily accessed locations in the NWT. Small soil and mud samples will be taken along NWT highways 1,3, and 7 during the late summer. All travel will be on highways, with actual collections made on foot. Soil samples will consist of only a few grams of material at each location. The samples will be taken to the University...