39 record(s) found with the tag "pipeline construction" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pointed Mountain Pipeline Abandonment Project
Principal Investigator: Carnochan, Stacey
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No.5579. The proposed fieldwork will inform the baseline setting of the Canada Energy Regulator (CER) Application amendment on while also aiding in the development of feasible mitigation measures that will reduce potential effects that the Project may have on aquatic environments, wetlands, wildlife, and vegetation. As well, t...


People, Land, and Pipelines: Perspectives of Resource Decision-Making Processes in the Sahtu Region, Northwest Territories
Principal Investigator: McLafferty, Carly A
Licensed Year(s): 2010 2007 2006
Summary: The aim of this PhD research project is to examine resource decision-making processes associated with proposals for the Mackenzie Gas Project. A main objective of this research is to explore the effectiveness of consultation and environmental assessment processes in addressing the values and needs of Sahtu communities; thus, the focus of this study is on local community conceptions of environment...


2006 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


2005 Route and Site Reconnaissance in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2005 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...


2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2004 Traditional Knowledge and Socio-Economic Studies in Trout Lake
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004
Summary: This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Trout Lake region which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...


Pipeline Route Aerial Photography Profiling (LiDAR)
Principal Investigator: Millman, Pete
Licensed Year(s): 2004
Summary: This project has been initiated as a first step in selecting a pipeline route between the M18 gas discovery and Parsons Lake. While construction of a pipeline from M18 to Parsons Lake will not occur for several years, the LiDAR project will allow Devon t...


2003 Spring, Summer and Fall Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


TOTAL PAGES: 4