2005 Route and Site Reconnaissance in the Sahtu Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
chercheur principal: Graburn, Larry
Année(s) de permis: 2005 2004
Résumé: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2004 Traditional Knowledge and Socio-Economic Studies in Trout Lake
chercheur principal: Povey, Andrew
Année(s) de permis: 2004
Résumé: This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Trout Lake region which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...


Pipeline Route Aerial Photography Profiling (LiDAR)
chercheur principal: Millman, Pete
Année(s) de permis: 2004
Résumé: This project has been initiated as a first step in selecting a pipeline route between the M18 gas discovery and Parsons Lake. While construction of a pipeline from M18 to Parsons Lake will not occur for several years, the LiDAR project will allow Devon t...


2003 Spring, Summer and Fall Aquatic Surveys in the Deh Cho Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2004 2003 2002
Résumé: The research team will conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Deh Cho Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investigations initia...


2003 Spring, Summer and Fall Aquatic Studies in the Sahtu Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...


2003 Spring, Summer and Fall Aquatic Studies in the Gwich'in Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...


2003 Spring, Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2003
Résumé: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2003
Résumé: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


TOTAL PAGES: 2