Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Nahendeh, with assistance from Alpine Environmental Consulting Ltd. and Golder Associates Ltd. was contracted on behalf of ChevronTexaco Corporation to conduct vegetation monitoring studies for the pipeline right-of-way from Chevron K-29 wellsite to the...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classificatio...
Principal Investigator:Marsh, Philip Licensed Year(s):200520042003
2002
20012000199919981997199619951994199319921990 Summary:
The primary objective of this project is to develop improved understanding of the fluxes of water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek site will be accessed by helicopter and s...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sites will be contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, vehicle and/or on foot. To avoid c...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...