23 record(s) found with the tag "environmental impact assessment" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Miller, Matthew Licensed Year(s):
2019
201820172016 Summary:
The objective of the monitoring and mitigation is to determine operating procedures and mitigation options for the annual shutdown at Taltson Hydroelectric Facility to minimize the environmental impact on downstream Trudel Creek.
Various mitigation options have been and are being assessed and the results on Trudel Creek are being monitoring to determine the best operating procedure for the ann...
Principal Investigator:Carson, Richard J Licensed Year(s):
2017
2015 Summary:
The objectives are to evaluate if there are differences in biological parameters among study sites and between years at the Tungsten Mine site; as well as to determine whether observed differences from the most recent (2015) Environmental Effects Monitoring study are still present and whether any differences are the result of mining practices.
The study objectives are to evaluate fish health, ...
Principal Investigator:Schryer, Richard P Licensed Year(s):
2017
201620142013201220112010200920082006200520042003 Summary:
The objective of this project is to complete a Supplemental Baseline Monitoring Plan (SBMP) for water quality, fish population and benthic invertebrate programs.
The SBMP contains two major study areas: Burke Lake, Reference Lake and the Marian River. Burke Lake will be the exposure area and Reference Lake will serve as the reference area for the SBMP. The exposure area for the Marian River wat...
Principal Investigator:Doucet, Michael Licensed Year(s):
2016
2015 Summary:
The primary objective of this research program is to determine the environmental and physical conditions of nine sites in the Gordon Lake region.
This research will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater. Samples of biota (e.g. Hyalella) may be collected at certain sites during the field program. The potential for...
Principal Investigator:Evenden, Matthew Licensed Year(s):
2016
Summary:
The objectives of this research are to learn about and articulate the importance of early impact assessment methodology to questions of political governance in the Northwest Territories. In this research into core concepts of the field of political geography, the Principal Investigator (PI) has found little that examines or articulates the manner in which traditional territories of Indigenous popu...
Principal Investigator:Smith, Sharon S Licensed Year(s):201820172016
2015
201420132012201120102009200820072006 Summary:
This project continues the on-going monitoring program of permafrost and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT). This phase of the project is largely data collection.
Objectives are:
• To provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and improve characterization...
Principal Investigator:Campbell, Joseph W Licensed Year(s):2018201720162015
2014
Summary:
Follow-up on exploration activity associated with Mackenzie Valley Land and Water Board land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activiti...
Principal Investigator:Goodjohn, Mitchell T. Licensed Year(s):
2013
2010 Summary:
The objective of the Traditional Ecological Knowledge and Socio-Economic data Collection Program for Tuktoyaktuk Harbour (the TEK Program) is to collect baseline data to enhance Imperial Oil Resources Ventures Limited’s (Imperial’s) understanding of the marine environment in Tuktoyaktuk Harbour, harvesting of traditional resources in the harbour and general area around Tuktoyaktuk, and the pattern...
Principal Investigator:Tonn, William Licensed Year(s):2014201320122011
2010
2009 Summary:
This licence is being issued for the scientific research application No.1287.
The objectives of this project are 1) to study the freshwater ecology, hydrology, and hydraulics of the Lac de Gras basin before habitat modification; 2) to monitor the changes in fish productivity resulting from the removal of blocks to fish passages; and 3) to assess the effectiveness of such habitat modifications t...
Principal Investigator:Blaschuk, Katherine Licensed Year(s):2011
2010
2009 Summary:
WorleyParsons, on behalf of Imperial Oil, is planning to initiate a benthic invertebrate and fisheries assessment program for the portions of Bosworth Creek adjacent to the Imperial Oil operations in Norman Wells, NWT. The objective of the project is to characterize biophysical conditions in Bosworth Creek in the area surrounding the lower Bosworth Creek Bridge; both upstream and downstream from t...