6 record(s) found with the tag "environmental impact assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Taltson Hydroelectric Facility Aquatic Monitoring
Principal Investigator: Miller, Matthew
Licensed Year(s): 2019 2018 2017 2016
Summary: The objective of the monitoring and mitigation is to determine operating procedures and mitigation options for the annual shutdown at Taltson Hydroelectric Facility to minimize the environmental impact on downstream Trudel Creek. Various mitigation options have been and are being assessed and the results on Trudel Creek are being monitoring to determine the best operating procedure for the ann...


NATCL Cantung 2017 EEM Program
Principal Investigator: Carson, Richard J
Licensed Year(s): 2017 2015
Summary: The objectives are to evaluate if there are differences in biological parameters among study sites and between years at the Tungsten Mine site; as well as to determine whether observed differences from the most recent (2015) Environmental Effects Monitoring study are still present and whether any differences are the result of mining practices. The study objectives are to evaluate fish health, ...


Environmental Baseline Surveys for the Fortune Minerals Limited NICO Project
Principal Investigator: Schryer, Richard P
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this project is to complete a Supplemental Baseline Monitoring Plan (SBMP) for water quality, fish population and benthic invertebrate programs. The SBMP contains two major study areas: Burke Lake, Reference Lake and the Marian River. Burke Lake will be the exposure area and Reference Lake will serve as the reference area for the SBMP. The exposure area for the Marian River wat...


Continuation of the Gordon Lake Assessment Project
Principal Investigator: Doucet, Michael
Licensed Year(s): 2016 2015
Summary: The primary objective of this research program is to determine the environmental and physical conditions of nine sites in the Gordon Lake region. This research will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater. Samples of biota (e.g. Hyalella) may be collected at certain sites during the field program. The potential for...


Environmental Assessment for Proposed Oil and Gas Development Activities in the Tulita area, NWT.
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety of ecosystems contained by or in close proximity to the potential well sites for a proposed natural gas development. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in the proposed development area. Any fish collection will be outlined by Department of Fisher...


Chevron Ft. Liard Potential Routing Selection Program
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...


TOTAL PAGES: 1