Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2009
2008 Summary:
Soil samples will be taken from representative sites in order to complete soil reclamation suitability assessment. Surficial sediments and soils will be described at each pit. In addition, notes will be taken on vegetation, drainage and terrain features, etc. A permafrost survey will consist of drilling shallow holes (<3 m) to determine permafrost conditions. Shallow permafrost drilling will be...
Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2009
Summary:
The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to support filing of regulatory applications in the future. Two years of data collection is important for obtaining baseline ground water hydrology and quality data where seasonal changes in groundwater levels, recharge and discha...
Principal Investigator:Wilbur, Steve Licensed Year(s):
2008
Summary:
This licence is issued for the scientific research application # 926.
The goal of this river geomorphology program is to describe the Slave River’s channel landforms and sediment characteristics and assess the sensitivity of these river landforms to potential changes in stream hydrology.
Field visits will include a reconnaissance flight via helicopter along the Slave River (from Fort Smith ...
Principal Investigator:Hoos, Rick Licensed Year(s):
2007
Summary:
The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...
Principal Investigator:Schmidt, Nathan Licensed Year(s):
2007
2004 Summary:
The overall objective of this project is to collect additional information from Kennady Lake and the surrounding watershed for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project.
De Beers Canada Inc. has been conducting hydrology baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to t...
Principal Investigator:Robertson, Scott Licensed Year(s):
2007
Summary:
The overall objective of this project is to collect additional Soil and Terrain information for use in the environmental assessment of the De Beers Canada Inc. proposed Gahcho Kué Project.
De Beers Canada Inc. has been conducting Soils and Terrain baseline studies for a number of years in the area of the Gahcho Kué Project. The studies planned for this year will add to the Terrain and Soils ba...
Principal Investigator:Standafer-Pfister, Shirley Licensed Year(s):
2007
2006 Summary:
The objectives of the hydrological program are to collect and store creek-discharge data in conjunction with creek-stage elevations in order to increase the accuracy of the stage-discharge relationship and prepare a time history of flow. The objectives of the meteorological program are to install instrumentation to collect site-specific meteorological data and to begin a site monitoring program.
...
Principal Investigator:Wolfe, Brent BBW Licensed Year(s):
2007
20062005200420032002 Summary:
This research program focuses on high-resolution reconstruction of past hydrology, ecology and climate of the Peace-Athabasca (PAD) and Slave River deltas (SRD) from natural archives, including lake sediments and tree rings, supported by comprehensive field-based studies of modern hydrology, limnology and aquatic ecology. The PAD and SRD have broad ecological and cultural significance and are ecos...
Principal Investigator:Christoffersen, Poul Licensed Year(s):
2006
2005 Summary:
This project aims to reconstruct the glacial history of Great Slave Lake, focusing on deep troughs located in the northeast arm of the lake. A large ice dome formed over the Great Slave region during the Last Glacial Maximum and meltwater possibly formed a large subglacial lake in the deep sector of Christie Bay during this period, when ice was about 4 km thick. Subglacial lakes are important beca...
Principal Investigator:Hoos, Rick Licensed Year(s):
2006
Summary:
The objective is to obtain sufficient baseline data to develop a lead and zinc mine adjacent to the old Pine Point property. The owl survey to identify species presence and breeding territories in the vicinity of the study area will include an evening broadcast-call program that will commence 0.5 hours after sundown to 0.5 hours before sunrise in April and May. This owl survey will target the Bor...