Principal Investigator:Chin, Krista Licensed Year(s):
2017
2016201520142013 Summary:
Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region.
The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...
Principal Investigator:Neufeld, Lori Licensed Year(s):
2009
Summary:
WorleyParsons, on behalf of Imperial Oil, is planning to conduct a remote sensing pilot project through use of a fixed-wing aircraft to capture environmental information on approximately 100 former drilling sites, as well as some former staging areas, campsites, artificial islands in the Beaufort Sea and other facilities located in the Northwest Territories. The purpose of the project is to determ...
Principal Investigator:Millman, Peter M Licensed Year(s):
2007
2006 Summary:
The objective of this project is to identify geophysical anomolies that will warrant additions to exploration activity (seismic surveys).
Three helicopters will be required for this project. Two Hughes 500’s will be used as longline helicopters to collect gravity data. The Hughes 500 is ideal for this longline operation as the helicopter is small and maneuverable. The third support helicopte...
Principal Investigator:Zantvoort, Willem Licensed Year(s):
2007
20062005 Summary:
Peel Plateau and Plain, an area with hydrocarbon potential spanning the NWT-Yukon border, lies southwest of the Mackenzie River, north of the Mackenzie Mountains, and east of the Richardson Mountains. A primary objective of this project is to expand geoscience knowledge to aid in informed land use decisions, as well as stimulate petroleum exploration, industry investment, and economic development ...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):2018201720162015201420122010200920082007200620052004
2003
Summary:
The main study objectives are to: 1) determine the status of permafrost landforms in the study area between Macmillan Pass and Plains of Abraham; and 2) determine the long-term recovery after abandonment of the CANOL No. 1 project. This is part of long-...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...
Principal Investigator:Melton, Derek Licensed Year(s):2002
2000
Summary:
Researchers will assess fish habitat (by documenting the potential of waterbodies) and to determine the presence or absense of wildlife in the vicinity of the proposed project. A search for registered archaelogical sites within the proposed area will also be undertaken. Information from these studies will form part of an environmental assessment for the proposed project. Researchers will access...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):20022001
2000
1999199819971996199519941993 Summary:
The main objectives of this study are to: 1. determine the status of permafrost land forms in the study area, and 2. determine the long-term recovery after abandonment of the CANOL No.1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Base camp is owned by Old Squaw Lodge at Camp 222. Beyond the base camp mountain bikes and foot will be the means ...