Principal Investigator:Belland, Darlene Licensed Year(s):
2017
20162015201420132012 Summary:
The objective of this project is to conduct ongoing monitoring and assessment programs, including areas in the Mackenzie River Special Management Zone (SMZ), for surface water.
Surface water samples will be collected from selected lakes, ponds, rivers, and streams. Selected water bodies in EL470 have already undergone bathymetric assessment and sampling.
ConocoPhillips will communicate, in ...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...
Principal Investigator:Kiss, Frank Licensed Year(s):2003200220012000
1999
Summary:
The purpose of this study is to improve the public knowledge and understanding of the geology of this area, as no publicly available magnetic survey coverage exists. This survey is entirely airborne, with no land access. The aircraft will be equipped with a state of the art magnetometer and navigation systems, including Global Positioning System (GPS). The aircraft will be operating from existing ...
Principal Investigator:Colpron, Maurice Licensed Year(s):
1997
Summary:
The project will be conducted from 10-12 tent fly-camps within the study area. Each camp will be set-out by helicopter (out of Norman Wells) and will be of a duration of approximately 5-7 days. Our work will consist of daily hikes from our camps, during which our observations of the rock types and mineral occurrences will be noted on 1:50,000-scale topographic maps and air photos. Data collectio...
Principal Investigator:Harry, David Licensed Year(s):
1984
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....