30 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Social and political perceptions of environmental resources extraction projects in the Sahtu Settlement Area
Principal Investigator: Perombelon, Brice B.P
Licensed Year(s): 2013
Summary: The principal researcher wishes to study the environmental impacts of resources extraction projects (present and future) on the community members. The hope is to do this through a survey of their perceptions of environmental problems caused by resources extraction projects (gas & oil) and see whether they think that these projects will create more problems of environmental degradation (for example...


Combined Phase I/II ESAs for Five Sites
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2010
Summary: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


Biological Studies of Waters Along the Proposed Mackenzie Gas Project Pipeline Route - Sahtu Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2008
Summary: The research will examine streams possibly affected by the proposed Mackenzie Gas Project pipeline, and streams that can serve as future control/reference sites. Measurements of stream nutrients, metals in stream water, water quality (DO, pH, conductivity, etc.), stream characteristics (flow, width, depth, etc.) and aquatic invertebrate abundance/species composition will be completed. Possible t...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


Population abundance and vital rates of fish harvested from lakes along the Mackenzie Valley pipeline route: Yeltea Lake 2006
Principal Investigator: Tallman, Ross F
Licensed Year(s): 2006
Summary: This study involves the assessment of valued fishes in lakes along the proposed Mackenzie Pipeline route. There is little information on fish populations in any of the smaller inland lakes of the region. Through community consultation in Fort Good Hope it was determined that Yeltea Lake should be studied. Yeltea Lake is utilized by residents for sustenance (containing lake trout, broad whitefish, ...


Distribution and Habitat Use of Sensitive Fish Species along the Mackenzie River Valley
Principal Investigator: Mochnacz, Neil
Licensed Year(s): 2006
Summary: The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail. Fish will be captured and identified for spec...


Sediment Transport Processes in Canyon Creek, Sahtu Settlement Region
Principal Investigator: Rempel, Laura L
Licensed Year(s): 2006 2005
Summary: The aim of this study is to characterize sediment transport processes, including bed scour and fine sediment deposition, in a sub-arctic stream intersected by the proposed Mackenzie Gas Pipeline. The specific objectives of the study are: characterization of surface and sub-surface bed sediment texture for all habitat types; measurement of bed scour depth and transport distance of sediment due to ...


Enhancement of Permafrost Monitoring Network and Collection of Baseline Terrain Information in the Mackenzie Valley Corridor - K'asho Got'ine District, Sahtu Settlement Area
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2006
Summary: Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...


Population abundance and vital rates of fish harvested from lakes along the Mackenzie Valley pipeline route – Loon Lake 2005
Principal Investigator: Toyne, Melanie J
Licensed Year(s): 2005
Summary: The proposed Mackenzie natural gas pipeline route crosses Loon River, which connects Loon Lake to the Mackenzie River. It is important to collect information on fish species in Loon Lake to compared with after the proposed pipeline is built to determine if any changes have occured. All field crew transported to Loon Lake via North-Wright twin otter floatplane. Crew will set nets to catch fish an...


2005 Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...


TOTAL PAGES: 3