21 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Continuation of the Gordon Lake Assessment Project
Principal Investigator: Doucet, Michael
Licensed Year(s): 2016 2015
Summary: The primary objective of this research program is to determine the environmental and physical conditions of nine sites in the Gordon Lake region. This research will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater. Samples of biota (e.g. Hyalella) may be collected at certain sites during the field program. The potential for...


Environmental Surveys for the Fortune Minerals NICO Project
Principal Investigator: Goad, Robin E
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: Fortune Minerals is considering an expanded exploration program on the NICO property, which will include building an all-weather access road. This program will require environmental baseline surveys to augment existing information on species and habitat...


Environmental Surveys for the Proposed All-Weather Access Road to Fortune Minerals NICO Project
Principal Investigator: Goad, Robin E
Licensed Year(s): 2004
Summary: Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...


Environmental Effects Monitoring for Miramar Con and Giant Mines
Principal Investigator: Caughill, Dave
Licensed Year(s): 2004 2003
Summary: The main objective of this study is to characterize environmental conditions and supplement existing environmental information for possible use in long-term (i.e., multi-year) Environmental Effects Monitoring (EEM) programs as required of the Giant and C...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


2003 Aquatic Effects Monitoring Program
Principal Investigator: Teichreb, Chris
Licensed Year(s): 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003
Summary: This work will assess the effects that mining may have on the aquatic environment of lakes within the Ekati claimblock as part of BHP Billiton's Aquatic Effects Monitoring Program. Data to be collected includes water quality, sediment quality, physical l...


Non-renewable Resource Assessment (Phase II Fieldwork), Edehzhie
Principal Investigator: Gal, Leonard
Licensed Year(s): 2003
Summary: The objective of the fieldwork is to further assess the non-renewable resource potential of the Edehzhie area, as a follow-up to Phase I work which was a review of existing data. This assessment is being carried out as part of the Northwest Territories P...


Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


Water, Sediment and Fish Testing of Marian River System
Principal Investigator: Nevitt, Zabey
Licensed Year(s): 1999 1998
Summary: For many years the Dogrib have trapped and fished in and around the Marian River. There are concerns that contaminants are entering the river system. some of the concerns include: effects on health from eating fish and effects on health from drinking water. Field collection will take place over 2 days. The team will travel by canoe from Rae. Ten fish will be caught by members of the community fro...


Gazelle Lake and Point Lake Preliminary Baseline Study
Principal Investigator: Bryant, Wayne
Licensed Year(s): 1998
Summary: The Gazelle environmental baseline study will include specific investigations on water/sediment quality, lake bathymetry, limnology, catchment hydrology, fisheries and fish habitat assessment. Field data collection and observations will take about two to three days. Field staff of 3 will be transported by air to Ekati from Yellowknife. From Ekati, helicopter transport will be used to drop off the...


TOTAL PAGES: 3