Principal Investigator:Sandlos, John K Licensed Year(s):2013
2012
201120102009 Summary:
The research team will work closely with members of four NWT communities to identify the historical and continued impacts of abandoned mines adjacent to their communities. The research team will ask how mineral development impacted the social life, economic prospects and local environments of Northern communities throughout the twentieth century, considering carefully the connections between socia...
Principal Investigator:Langhorne, Amy Licensed Year(s):
2011
Summary:
The objective of the plant and soil sampling is to determine baseline metal and polycyclic aromatic hydrocarbon concentration in surficial soils and plants growing in the study area. The data will be used in the human health and terrestrial wildlife risk assessment.
The proposed study will include the collection of up to 30 co-located soil, plant, and insect samples at six terrestrial locations...
Principal Investigator:Lawson, Nick Licensed Year(s):
2011
20102009 Summary:
The goal of the 2011 Surface Water Hydrology & Climate program at Thor Lake is to collect additional data that describes the existing surface water and climate conditions at the Thor Lake Property. This information is required for continued baseline monitoring, environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the ann...
Principal Investigator:Jardine, Cindy G. Licensed Year(s):
2010
Summary:
The overall research question is “Did the information provided to stakeholders (and other interested and affected parties) about the Giant Mine Remediation Plan allow them to equally and fairly participate in the consultation process?” Specific objectives of this research are:
1. To review available documents on the Giant Mine Remediation Plan, and assess these in terms of accessibility, content...
Principal Investigator:Ziervogel, Herb Licensed Year(s):
2010
Summary:
The objectives of this project are to conduct environmental site assessments at the five sites to identify the extent of various contaminations in the soil, water and sediments. A remediation action plan will be prepared for future cleanup at the sites.
The field team will use shovel and hand auger to collect limited soil and waste rock samples for lab testing. The lab testing will focus on ...
Principal Investigator:Lawson, Nick Licensed Year(s):
2010
20092008 Summary:
The fisheries portion of this baseline program has three primary objectives: to identify the fish species composition in a subset of the lakes and streams near the Thor Lake project area, to identify existing fish habitat in those lakes and streams, and to measure the current levels of mercury, rare earth elements and other trace elements in fish tissues. A secondary objective of the program is to...
Principal Investigator:Lawson, Nick Licensed Year(s):20122011
2010
20092008 Summary:
The objectives of this project are to characterize the baseline water and sediment quality within the Thor Lake area, and to characterize the baseline aquatic community through the collection of phytoplankton, zooplankton and benthic invertebrates.
Water, sediment and aquatic organisms will be collected from 20 stations within the Thor Lake area. Most stations will be accessed by ATV and/or bo...
Principal Investigator:Mitchell, Ross E. Licensed Year(s):
2010
20092008 Summary:
The objective of the socio-economic study is to collect baseline data to enhance Fortune's understanding of conditions in communities potentially affected by the NICO project. The information will be used to prepare documents required by regulators to make decisions about the project.
The socio-economic study may include, in addition to reviews of secondary data sources, key informant intervie...
Principal Investigator:Davidson, Scott Licensed Year(s):
2009
Summary:
The Phase I Environmental Site Assessment is a "non-intrusive" assessment, means no borehole or test pit will be drilled on the site and no water or soil samples will be collected or laboratory analyses. The majority of the work focus on desktop studies, by reviewing previous drilling reports, geological investigation reports, environmental assessment reports, claim reports, information at the go...
Principal Investigator:Robb, Tonia L Licensed Year(s):
2009
Summary:
The objectives of the monitoring program are to ensure that the on-site remediation works remain effective; to ensure that site specific health risks are monitored; and to identify any long-term changes that might be indicative of failures of the remediation works.
The above objectives will be met by conducting a geotechnical inspection of the decommissioned mine, tailings and waste dump areas;...