10 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Yellowknife Gold Project 2010 Hydrometeorological Survey
Principal Investigator: Draho, Bob
Licensed Year(s): 2010 2009
Summary: The objectives of this four day field survey is to inspect the 4 hydrology stations and 1 meteorology station to ensure they are in working order, repair if required, and download site-specific weather and stream flow data from the stations. Equipment at each hydrostation consists of a datalogger (to record) and a pressure transducer (to detect fluid pressure and produce a signal related to the...


Matthews Creek 2009 hydrometeorological survey
Principal Investigator: Draho, Bob
Licensed Year(s): 2009 2008
Summary: This licence is being issued for the scientific research application No. 1121. The objectives this research to document the time history of flow in Matthews Creek and site-specific weather data for the Matthews Lake Gold Project. This will be done in three site visits. During the first site visit, researchers will to reinstall creek monitoring instruments, and inspect and download the exist...


Tyhee Hydrology and Meteorology Data Collection Project
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007
Summary: The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...


Hydrometric Survey and Meteorological Station Installation and Monitoring - Matthews Creek, NT
Principal Investigator: Standafer-Pfister, Shirley
Licensed Year(s): 2007 2006
Summary: The objectives of the hydrological program are to collect and store creek-discharge data in conjunction with creek-stage elevations in order to increase the accuracy of the stage-discharge relationship and prepare a time history of flow. The objectives of the meteorological program are to install instrumentation to collect site-specific meteorological data and to begin a site monitoring program. ...


Investigations of the water cycle and hydrological processes of the subarctic Canadian Shield
Principal Investigator: Spence, Christopher
Licensed Year(s): 2017 2016 2012 2011 2010 2009 2008 2007
Summary: The objective of the research is to determine the water cycle processes in lakes and streams affecting Baker Creek and similar streams, and more generally to understand how small scale processes influence those of larger areas. Field studies at Baker Creek, a typical Canadian Shield stream that drains ~130 km2 into Great Slave Lake, will focus on the spring melt and summer seasons. Existing i...


Gahcho Kue' Biophysical Baseline Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Hydrological Processes of a Canadian Shield Basin
Principal Investigator: Mielko, Corrinne
Licensed Year(s): 2004
Summary: Lakes and wetlands in the Canadian Shield have important storage effects that greatly modify runoff generation from the basins. The project objective is to understand and quantify the hydrological processes operating at the basin scale in a boreal Shelf...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


Hydrologic investigation of a Canadian Shield basin
Principal Investigator: Spence, Chris
Licensed Year(s): 2001 1999 1998
Summary: Lower Carp Lake is part of the Yellowknife River and is roughly 22km in size. A number of remote meteorological and hydrometric data collection sites will be constructed around the lake. An island on the lake will be used as a base camp for the research activities. This island is roughly circular rising up to 50m from the lakeshore. A portion of the island is dominated by sandy glacial deposits. M...


TOTAL PAGES: 1