8 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Evans, Marlene S. Licensed Year(s):20092008
2007
2006 Summary:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Marsh, Philip Licensed Year(s):
2005
20042003200220012000199919981997199619951994199319921990 Summary:
The primary objective of this project is to improve understanding of the changes in water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek, Hans Creek, and Zed Creek sites will be accessed...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...
Principal Investigator:Brooks, Greg Licensed Year(s):
1993
Summary:
If an oil and gas pipeline is constructed that extends from the Mackenzie Delta to the south, the pipeline will likely cross the East Channel at either Lousy or Swimming Points. Both of these sites have been studied in the past, but little detailed information has been collected on the physical features of these sites. Data will be collected on the features of these sites, including a survey of ...
Principal Investigator:Sherstone, David A. Licensed Year(s):
1979
Summary:
To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....