19 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Doré, Guy Licensed Year(s):
2020
2019 Summary:
This licence has been issued for the scientific research application No.4629.
The main objective is to develop a practical method for the mechanical and thermal design of embankments built on permafrost based on the properties of the active layer and of the permafrost as well as the loading conditions. The development of decision-making tools to select the optimal course and the optimal embankm...
Principal Investigator:Kasook, Davonna C Licensed Year(s):2018
2017
Summary:
The objective is to compare differences in snow depth, density and morphology of a heavily forested site and a tundra site. The Principal Investigator (PI) will study the effect landscape (forest vs. tundra) has on seasonal snow pack evolution and physical properties (density, temperature, snow grain morphology, and stratigraphy) of the snowpack. These results will be compared to historical data (...
Principal Investigator:Marshall, John J Licensed Year(s):
2013
Summary:
The objective of this project at Thetis Bay is to ensure there is no unforeseen debris in the water around the caissons prior to moving. The objective at Tuktoyaktuk is to see if the caissons could be moved close enough to shore to offer a benefit to mitigate shore erosion.
One small bathymetry vessel would be used in the program and one large Northern Transportation Company (NTCL) mainline tu...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2009
Summary:
The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation.
The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...
Principal Investigator:Henderson, Bob C. Licensed Year(s):
2007
Summary:
The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...
Principal Investigator:Millman, Pete Licensed Year(s):
2002
Summary:
The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...
Principal Investigator:Dallimore, Scott R Licensed Year(s):200820072002
1998
Summary:
Field activities for this project will be covered under various permits being applied for the engineering operations. Scientific studies being conducted as part of this research will be mainly laboratory oriented to research on the geology, geochemistry, permafrost and gas hydrate properties of drill cores, interpretation of geophysical data and other fundamental research. The Geological Survey of...
Principal Investigator:Brooks, Greg Licensed Year(s):
1993
Summary:
If an oil and gas pipeline is constructed that extends from the Mackenzie Delta to the south, the pipeline will likely cross the East Channel at either Lousy or Swimming Points. Both of these sites have been studied in the past, but little detailed information has been collected on the physical features of these sites. Data will be collected on the features of these sites, including a survey of ...
Principal Investigator:Forbes, Donald L Licensed Year(s):
1991
1990 Summary:
The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....