40 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Kokelj, Steven V Licensed Year(s):2006
2005
Summary:
Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...
Principal Investigator:Wright, Fred J Licensed Year(s):2012201120102009200820072006
2004
Summary:
This pilot study will address identified gaps in knowledge critical for assessing the impacts of regional oil and gas development in the vicinity of the Mackenzie Delta and Richards Island, with respect to exploration and drilling activities, well-head a...
Principal Investigator:Mislan, Marie Licensed Year(s):
2003
Summary:
This work is part of preliminary information gathering related to a possible natural gas development at Parsons Lake. ConocoPhillips Canada is interested in determining the topographic features of the study area both for drainage assessment and for dete...
Principal Investigator:Kokelj, Steven V Licensed Year(s):
2003
Summary:
In the Mackenzie Delta region, many of the drilling mud sumps constructed in the 1970s have partially or completely collapsed. The collapse of a sump can release contaminants previously immobilized in permafrost. The long-term degradation of many sumps...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Kiss, Frank Licensed Year(s):2003
2002
200120001999 Summary:
This survey will improve public knowledge and understanding of the geology of this area, as no publicly-available magnetic coverage exists. Survey lines will be flown at a spacing of 800 metres and a 200 metre mean terrain clearance (where possible, give...
Principal Investigator:Millman, Pete Licensed Year(s):
2002
Summary:
The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...
Principal Investigator:Marsh, Philip Licensed Year(s):200520042003
2002
20012000199919981997199619951994199319921990 Summary:
The primary objective of this project is to develop improved understanding of the fluxes of water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek site will be accessed by helicopter and s...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...