Principal Investigator:Duk-Rodkin, Alejandra ADR Licensed Year(s):
2007
200620052004 Summary:
Project objectives are to map, identify, describe characteristics (geotechnical aspects) and date surficial deposits in the vicinity of the proposed pipeline corridor. This knowledge will assess: 1. granular resources. 2. slope instability, landslide occurrence and potential due mainly to instability of the active layer, forest fires and erosion. 3. geochemical analysis on a regional basis of till...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be carried out ...
Principal Investigator:Pawluk, Rick D Licensed Year(s):
2007
Summary:
The objective of the study is to collect Traditional Knowledge (TK) relevant to the Mackenzie Gas Project (MGP).
AMEC Earth & Environmental will coordinate the research. The Liidlii K’ue First Nation has been contracted to document Traditional Knowledge, including interviewing TK holders. Local researchers will be hired to collect and analyze data. A local translator will be hired to translat...
Principal Investigator:Kustan, Ed Licensed Year(s):
2005
Summary:
The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...
Principal Investigator:Van Stempvoort, Dale R. Licensed Year(s):
2005
Summary:
The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
2004 Summary:
The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans.
The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Gill, Lyall Licensed Year(s):
2003
Summary:
This study involves collecting existing Traditional Knowledge information, gathering new information, and producing a Traditional Knowledge report. A cooperative approach has been developed involving Mackenzie Gas Project (MGP), Mackenzie Project Environment Group (MPEG), Liidlii Ku'e First Nation and Metis Nation of Fort Simpson. Project management is being provided by Nogha Geomatics Ltd. whic...