Principal Investigator:Elliott, Milissa A Licensed Year(s):
2008
Summary:
This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling.
Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Nahendeh, with assistance from Alpine Environmental Consulting Ltd. and Golder Associates Ltd. was contracted on behalf of ChevronTexaco Corporation to conduct vegetation monitoring studies for the pipeline right-of-way from Chevron K-29 wellsite to the...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1998
Summary:
Fisheries and vegetation field work will begin in June 1998. Three small streams north of Fort Liard will be surveyed to determine if fish are present or absent and to assess the fish habitat in each creek. Two of these creeks are tributaries to the Liard River and are located near the P66 well site. Fisherman Creek, the tributary draining into Fisherman Lake from the Liard Range will also be surv...
Principal Investigator:Squires Taylor, Cindy Licensed Year(s):1992
1991
Summary:
The Researcher will conduct a survey, approximately 30 km on either side of the Mackenzie River using satellite imagery. A classification will be undertaken of the area from the Mackenzie Delta to the Fort Simpson area, with wider zones along the east side to include proposed pipeline routes. The information can be plotted as colour maps to show the location of trap lines, forest fires or wildlife...